2008
The project was based on building housing block on a plot of 327 m2 with an occupancy rate of 60% (200 m2) in Pineda de Mar. The project consisted in ground + 3 floors and were obtained 10 homes between 40 and 60 m2.
Tipology: Housing
Location: Pineda de Mar
Year: 12/2008
Client: DIBA
Built area: 1.800 m2
Autor: Marc Casany