The proposal is located within the perimeter of the former FABRA I COATS factory, which is currently blurred due to the demolition of part of the wall that once enclosed the site. The project was sensitive to this condition and sought to restore the wall along its original alignment, running around the entire perimeter of our project. This wall was fragmented at ground-floor level to allow both physical and visual communication between the street, the school, and the various public spaces surrounding it.